Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
1
/
of
7
Fajocru
Senior GPS Smart Watch with Fall Detection - 4G LTE Elderly Smartwatch with Real-Time Location, SOS Alerts, and IP67 Waterproof - Ideal for Dementia/Alzheimer’s Safety (Matte Red)
Senior GPS Smart Watch with Fall Detection - 4G LTE Elderly Smartwatch with Real-Time Location, SOS Alerts, and IP67 Waterproof - Ideal for Dementia/Alzheimer’s Safety (Matte Red)
Regular price
$143.98 USD
Regular price
$143.98 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- Instant Fall Alert System: Built-in high-precision sensors automatically detect accidental falls and send an instant emergency alert to designated contacts via the app, ensuring timely assistance when every second counts.
- Fall Detection & Emergency SOS When fall detection is enabled, the watch will automatically send an alert to family members' phones if a fall is detected. In an emergency, simply press and hold the power button for 3 seconds to trigger an SOS alert to preset contacts. This service comes with no monthly fees.
- Reliable Location & Route History: Advanced GPS technology delivers real-time positioning and stores one month of location history. This is especially invaluable for monitoring loved ones with early-stage dementia or Alzheimer’s, ensuring you always know their whereabouts.
- Stay Connected Anytime: Crystal-clear two-way calling and voice messaging keep seniors engaged with family. Pre-installed with a data-only SIM card (1 year free data service) for instant location tracking. For voice calls, simply insert your standard SIM card with voice service.
- Durable & Comfortable for All-Day Wear: Designed with seniors in mind. The lightweight ABS case, soft silicone strap, and HD touchscreen offer superior comfort. Rated IP67 water-resistant, it withstands accidental spills and showers. Detailed instructions and dedicated customer support are included for easy setup.
Overview
- Operating System : Android Wear 1.0
- Memory Storage Capacity : 1 GB
- Special Feature : 15 Features:Video Phone Call and Text,Camera, Step Count, Sleep Monitor,Chronometer ,Heart Rate Monitor, Blood Pressure&Blood Oxygen, Alarm,Temperature-check, Calculator, Notifications,SOS Emergency-calling,Call Logs, Dial Pad(Touch Screen),smart watch can adapt to more than 460 kinds of APN, no matter which district you are in,or even to see the Northern Lights in Norway, the watch automatically locates the time where you are, don't have to manually adjust the time yourself. 15 Features:Video Phone Call and Text,Camera, Step Count, Sleep Monitor,Chronometer ,Heart Rate Monitor, Blood Pressure&Blood Oxygen, Alarm,Temperature-check, Calculat… See more
- Battery Capacity : 600 Milliamp Hours
- Connectivity Technology : Cellular
- Battery Cell Composition : Lithium Polymer
- GPS : Built-in GPS
- Shape : Round
- Screen Size : 1.56 Inches
- Brand : Fajocru
Share
